PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfill Job site Facing South (800x600).jpg Finish rebar installation at footings Elev. 7-Stair -4,5 Facing North (800x600).jpg Securing the Shear wall panels at Elev. 1,2,3 2nd floor Facing East (800x600).jpg Waterproofing around foundation walls at Elev. 4-Stair -2 Facing North-East (800x600).jpg Compacting soil around foundation walls at Elev. 5-6 Facing (800x600).jpg Installing the Shear wall panels at Elev. 1,2,3 2nd floor Facing South-East (800x600).jpg